Allbet Gaming

Fukushima debris removal delayed by another year

Allbet登录网址 2022年08月28日 体育 4 0

足球投注网www.hg108.vip)是皇冠体育官网线上直营平台。足球投注网面向亚太地区招募代理,开放皇冠信用网代理申请、皇冠现金网代理会员开户、皇冠足球投注等业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

足球投注平台www.hg9988.vip)是皇冠体育官方投注平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。 Allbet Gaming声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:Fukushima debris removal delayed by another year
发布评论

分享到:

任九(www.99cx.vip):No one party will win 50% of votes, says Dr Mahathir\u00a0
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。